Hello,
I am new to posting on this forum, but have been intermittently lurking for a number of years. I have a problem that I have not been able to solve myself or find a solution anywhere
I regularly find that I get a General Protection Violation when I try to set up a calculated field in a report.
I have a calculated field in a final report band and if, for example, I set the value to something like..
Code:
Sum([Capitalgains.PaymentReceived]) - Sum([Capitalgains.CostOfPurchase])
If the report is opened in design mode and not previously run, I can save the report and it crashes out when I try to run it, or, if I have previously run it, it crashes when I try to save any changes to the calculated field. Once changed, saved, exited Paradox and reopened, it works perfectly!
Is this a known bug, or am I overlooking something very silly?
Many Thanks
Mark
Acer 1.8GHz Win XP SP2
Paradox 10.0.0.990
BDE 5.01