If this is your first visit, be sure to check out the FAQ by clicking the link above. You may have to register before you can post: click the register link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below.

 
Go Back  dBforums > Database Server Software > DB2 > Data Migration - industry practices for %tage of data to verify

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1 (permalink)  
Old 07-23-07, 00:14
donutpancake donutpancake is offline
Registered User
 
Join Date: Jul 2007
Posts: 1
Data Migration - industry practices for %tage of data to verify

Hi, i am preparing the Data Migration Plan for migration of existing data from ADABAS to DB2. The data volume can be as huge as 200 GB. Since it is impossible to verify all the data migrated, does anyone know of any industry practices for the percentage of data to be verified for different record range.

For example,
small sys: 0 to 1million records (1%)
medium sys: 1 to 10million records (5%)
large sys: 10million records and above (10%)

Thanks Much!
Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is Off
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On