Hello DB2 Experts,
We have a Production system that is currently using disc sync to a remote location. But to get the data mounted and function it'll take minimum 2 minutes.
We have DB2/AIX64 9.1.5, what would be the best way to have the Production and DR box sync with no downtime at all?
Thanks!