Hi,


We are Upgrading to V9.5 Workhgroup Server edition from V8.1.9 WSE

It seems that on this upgrade are skipping taking Offline Backup of database POS. (To Save Time)

I don’t really recommend that but the point was to use online backup already taken as a scheduled job.



ONLINE backup starts at 1:00am and finishes by 2:45 am. The LOGS are included.

We restore the database and rollforward to the END OF LOGS.

ROLLFORWARD DATABASE POS TO end of logs and stop OVERFLOW LOG PATH (G:\POS_Daily_Backup')

This is only for the situation if we have to rollback to 8.2.



We are going to stop at 5:30 am whereas online backup finishes @ 2:45 am.



So, I will copy the all the logs after the last LOG included.



Question:

To rollforward to last transaction committed till 5:30,
Do I have to issue another rollforward till 5:30 am (2:45 -5:30) ??
or the same will rollforward till 5:30am .



Please advise me.

DBFinder
Reply With Quote
  #2 (permalink)  
Old 05-26-09, 10:23
ARWinner ARWinner is offline
Registered User
 
Join Date: Jan 2003
Posts: 3,575
You will not be able to use an Online Backup on V 8.x and restore it to V 9.5 and rollforward. V9.5 cannot read the logs from V8.x. You will have to do an offline backup. There is no other option.

Andy
Reply With Quote
  #3 (permalink)  
Old 05-26-09, 10:33
DBFinder DBFinder is offline
Registered User
 
Join Date: Sep 2008
Location: Toronto,Canada
Posts: 606
ARWinner,

I meant tom say, just in case I need to roll back to 8.2.


Quote:
This is only for the situation if we have to rollback to 8.2.



We are going to stop at 5:30 am whereas online backup finishes @ 2:45 am.



So, I will copy the all the logs after the last LOG included.



Question:

To rollforward to last transaction committed till 5:30,
Do I have to issue another rollforward till 5:30 am (2:45 -5:30) ??
or the same will rollforward till 5:30am .
Thanks

DBFinder
Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is Off
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On