mmm ... I have seen a system hang when rebalance is in progress ... I think it is primarily I/O contention and also other resources used by the rebalancer ...
The system hang has also happened to me when I was creating a 40 gig tablespace .... I got an error saying that maximum number of processes have been allocated to db2 ... but for sure , it wasn't ... A PMR with IBM did not really help ... The conclusion (!!???) at our shop was that even the resource required to create a connection was not available ....
(A painful byproduct of this poblem is that the management has strictly said 'No tablespace creation or extension before 10pm

)
Quote:
Originally posted by dollar489
Hi:
I am adding new containers to existing tablespaces and during the rebalancing process, database hang for 5 to 10 minutes. During this time I can not do anything e.g. connect, list tablespaces, get snapshot etc. commands. But if I was already connected the database prior to hanging I can do most SQL operations but no db2 or CLP commands.
Containers are quite large 20G and I am adding two of them to existing two (total of 4 containers at the end).
Has anybody noticed this behaviour before and any idea why would it hang?
DB2 UDB V8 FP3 on Windows
dollar
|