Results 1 to 3 of 3
  1. #1
    Join Date
    Dec 2003
    Posts
    41

    Unanswered: using DTS to copy one database into another... how long should it take? 1.5 gigs

    i'm using DTS to copy one database into a new database, copying over everything, i.e. stored procedures, views, etc.. not just the tables.. how long should it take? it's been stuck at 22% now for about 15 minutes?

    thanks

  2. #2
    Join Date
    Sep 2003
    Posts
    364
    Well...it kind of depends on a lot of different things. I have a 3gb database that takes 30 minutes. It'll appear to pause on the completion percent just like you stated when it's populating a large table. Give it some time and it should finish.

  3. #3
    Join Date
    Dec 2003
    Posts
    41
    Quote Originally Posted by peterlemonjello
    Well...it kind of depends on a lot of different things. I have a 3gb database that takes 30 minutes. It'll appear to pause on the completion percent just like you stated when it's populating a large table. Give it some time and it should finish.
    Alright cool.. thanks for the reply.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •