Results 1 to 2 of 2
  1. #1
    Join Date
    Jun 2005
    Posts
    319

    Unanswered: scheduling a blackout period for a job

    If I schedule a job to start at 1:15PM and end at 11:30AM will this affectively only run between 1:15PM and 11:30AM and skip the time period between 11:30AM and 1:15PM?

    Or do I need to create two schedules for the job?

  2. #2
    Join Date
    Mar 2003
    Location
    The Bottom of The Barrel
    Posts
    6,102
    Provided Answers: 1
    I would use two schedules. Way simpler than trying to rig something up.
    oh yeah... documentation... I have heard of that.

    *** What Do You Want In The MS Access Forum? ***

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •