Results 1 to 3 of 3
  1. #1
    Join Date
    Jul 2005
    Posts
    103

    Unanswered: email notice of backup in progress

    AIX 6.1
    DB2 9.7

    We have recently upgraded to DB2 9.7.

    I understand that things get deprecated, like the Control Center and the DAS.

    I have been trying to commit to using the Data Studio, but one thing still eludes me.

    I have basic alert notices on some production systems, one of which is to simply send notice via email when a backup is in progress on a tablespace.
    I have the DAS running and used the Control Center to set up this simply by defining contacts and a mail server address to use in the screens for defining an online maintenance window even though the backup in use is not an automatic backup.

    I have not found where in the Data Studio to establish the same ability so I continue to use the DAS and Control Center for now.

    So, how to do this without the DAS and Control Center?

    Thanks in advance,
    -Gary

  2. #2
    Join Date
    Jun 2003
    Location
    Toronto, Canada
    Posts
    5,516
    Provided Answers: 1
    I think you're looking for this: IBM Data Studio web console
    ---
    "It does not work" is not a valid problem statement.

  3. #3
    Join Date
    Jul 2005
    Posts
    103
    That is what I was afraid the answer would be, seems more involved than the simplicity of DAS and Control Center.

    Thanks though.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •