Results 1 to 3 of 3
  1. #1
    Join Date
    May 2004
    Location
    New York State
    Posts
    1,178

    Unanswered: Tabbed Form Question

    I was tasked to clean up a multi-page tabbed form by moving controls from one tab to another, keeping similar controls together. However, every time I do a cut-and-paste, I find that the entire moved group is now on all, or at least most, pages of the form. What am I doing wrong? I'm using A2010.

    Thanks,
    Sam

  2. #2
    Join Date
    Mar 2009
    Posts
    5,442
    Provided Answers: 14
    1. Open the Property window.
    2. Select the control you want to move and cut it (Ctrl + X).
    3. In the Property window, select the Page of the Tab control where the control must be placed
    4. Paste the control (Ctrl + V).
    Have a nice day!

  3. #3
    Join Date
    Mar 2009
    Location
    Dorset
    Posts
    119
    Sinnho has given some good instructions but one thing to be aware of - copying and then pasting controls will make them lose any VBA events linked to them so you will need to set these back up.
    Regards
    JD

    Software-Matters

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •