Hi all,

I am using SQL server agent to start a DTS-Job (DTS-Job-Control). It is scheduled to run once a minute.

The DTS-Job istself starts other DTS-Jobs which will definitely run much longer than a minute.

I was assuming that "an instance" of DTS-Job-Control would run once a minute even if the first instance of DTS-Job-Control has not yet completed. Am I wrong?

Is there a way of having the server agent start the same job each minute in parallel?

Thanks

kbk